

Projects (as Main Contractor)
New Built Works Construction:
Residential Building, No. 4 Kent Road, Kowloon Tong
Residential Building, No. 147 Waterloo Road, Kowloon Tong
Commercial Building, 40 Kimberley Road, Tsim Sha Tsui
Residential Building Works, 11 Sha Tin Ridge Road, Sha Tin
Seng Tak Central School Building Project, New Clear Water Road, Kowloon
Commercial Development 24A &24B Granville Road, Tsim
No.8-12, Yuen Long Pau Cheung Square, Yuen Long
Composite Building On K.I.L 11238 At Nos 445-447 Shangshui street, Kowloon
E&M Works Construction:
Sha T
Redecoration Work
Kau To Shan and Hong Lok Yuen South Bay,
和明以主承建商的身份完成了(liǎo):
1.尖(jiān)沙咀金巴利道(dào)40
2.香港觀塘新(xīn)清水(shuǐ)灣道重置香(xiāng)港扶幼會盛德(dé)中心學校建築工程(整單(dān)所(suǒ)有項(xiàng)目)
3.香港沙田嶺(lǐng)道(dào)11號住宅建築工程
4.沙田火炭數據(jù)中(zhōng)心工程(機電設備連裝(zhuāng)修)
5.九肚山以(yǐ)及(jí)康樂園南灣、壽臣山、加列山(shān)等豪宅(zhái)裝修(xiū)等
7.九龍(lóng)塘根德(dé)道4號單幢式住(zhù)宅
9.尖沙咀加(jiā)連威老道24A&24B大(dà)廈(shà)
10.元(yuán)朗炮仗坊 8-12號
11.旺角上海(hǎi)街445號住宅大
12. 屯(tún)門環保園廢紙回收廠房及其他(tā)相關的(de)發(fā)展項目之
Hong Kong's Siu Sai Wan Park Drainage Project,
Government Development Department's Tin Shui Wai Wooden Bridge Project,
Tung Chung Road Extension Project, and other steel structures, pavements, channel works, concrete structures and drainage works.
Phase III Reclamation 2009/19 project of the steel railing project, airport railway depot steel structure.
A&A Works Construction:
The renovation project of Sha T
Shanghai Lu Pu Bridge Steel Structure Engineering.
Mobile safety fence in the Wan Chai - Central Phase II reclamation works.
Other projects completed by the Company include:
Shatin Vista Paradiso external area ; site wooden & steel decoration work
土有什么色情网站,来个色情网站,淫色情网站,大型色情网站程
其他(tā)工程